Explainer

Why did a finished bridge to North Korea sit unused for years?

AI-generated text and synthetic voice. How this text is made

A South Korean government source says Kim crossed the Yalu from Sinuiju into Dandong on Saturday, over the new bridge, though North Korea's state media has not mentioned the trip.

Yalu River border

Sinuiju and Dandong

The four-lane bridge sat unused for 12 years. The holdup was on the North Korean side: North Korea didn't connect it to its roads while relations with Beijing were cool.

12

years the bridge sat unusedSource: Deutsche Welle · 24.10.2026

The bridge was completed in 2014 but only opened in mid-October, about a week before Kim's reported crossing. Russia had opened its own road bridge to Pyongyang about a month earlier, a move that reportedly unsettled Chinese officials.

Built, then opened
  1. 2014Finished on China's side
  2. October 2026Opens to traffic

Watch the explainer

Synthetic voice (AI)

The story

Kim Jong Un makes one-day trip to China, visits Dandong and crosses new bridgeRead the article

Based on reports by

List of sources