Digital · Paterna and Murcia
Kumo opens second Tier IV data centre in Paterna, Valencia, for AI workloads
The El Corte Inglés unit has opened its Paterna site, which runs at 30% capacity with 35 staff after starting operations in June with 2.4 MW of power.
AI text based on reports by ABC TU DIARIO EN ESPAÑOL, El Confidencial, La Razón and other publishers. Published . How it is made
For membersThe first 30 seconds for everyone. Synthetic voice (AI).
In brief
Kumo Networks, part of Grupo El Corte Inglés, inaugurated its Paterna site on 17 November, its second after Murcia. The centre runs at 30% of capacity with 35 employees and draws 2.4 MW.
The site holds Uptime Institute Tier IV certification and ENS ALTA certification, with more than 1,000 square metres of IT rooms split across three specialised areas.
The project was first announced four years ago with more than 50 million euros of investment, which the company now declines to quantify. The facility sits below the 10 MW threshold of the new government decree.
Telefónica, Orange and Vodafone are named as operators served by Kumo, acting both as carriers and as clients at the Paterna centre.
The opening in Paterna
Kumo Networks, the data centre subsidiary of Grupo El Corte Inglés, has opened its new facility in Paterna, Valencia, at the Táctica business park. The company describes it as a site of maximum security, built to host artificial intelligence workloads and the technology needs of companies and public administrations. The centre is in its start-up phase and currently runs at 30% of its capacity with 35 employees on staff. It is the second Kumo facility after the one the company already operates in Murcia, and the two are to be interconnected.
The inauguration on 17 November was attended by Marián Cano, the regional councillor for Industry, Tourism, Innovation and Commerce, the mayor of Paterna, Juan Antonio Sagredo, CEO Laura Galián and operations director Manuel Moreno, along with representatives of the business and technology sector.
Design and certification
The facility holds Tier IV certification from the Uptime Institute, which the company presents as the highest international level for availability and resilience. The certification confirms the infrastructure is designed to keep running through incidents or planned maintenance, because all critical systems have full backup. The equipment is cooled by a CO2-based system rather than water. According to La Razón, the building contains more than 1,000 square metres of IT rooms split across three specialised areas for high-density cloud, telecom operators and advanced colocation. The Paterna site also holds the ENS certification at the ALTA category for its colocation and cloud services, alongside ISO 27001, ISO 27017, ISO 27018 and ISO 22301. Kumo is presented as the only national provider with two interconnected Tier IV data centres.
Services and customers
The centre supports cloud infrastructure (IaaS), colocation and hybrid cloud services, with a focus on connectivity as a neutral interconnection node between companies and telecom operators. Operators Telefónica, Orange and Vodafone are already served by the company, acting both as carriers that route data from customers to the Paterna servers and as clients in their own right. The site sits about 90 metres above sea level in the Táctica industrial estate, outside the flood-prone zones of metropolitan Valencia that the October 2024 DANA exposed.
Galián described the project in broad terms.
“an infrastructure designed to respond to some of the great technological challenges of our time”
Investment and regulation
The Valencia project was first announced four years ago with an investment of more than 50 million euros, but the company now declines to give figures. El Confidencial reports the facility has absorbed more than 50 million euros of investment. Kumo's power capacity sits below the 10 MW threshold that a new government decree uses to set stricter sustainability conditions for data centres, and the company says the decree will not affect its growth strategy. Galián said the site's electrical capacity is more than consolidated for offering proximity services in Spain under the national and European legal framework.
The company has been selling server racks at the site since June, when it began operations. Galián also framed the sector's role in the wider economy.
“Digitalisation has stopped being a process confined to certain activities and has become an element transforming our economy”
Outlook
Kumo's growth plan rests on staying close to its clients, and the company has not said whether it already has further locations in mind. The Paterna centre is now the second node in a network that the company expects to operate across two Tier IV sites.
Ask about this text
Sources and context
- ABC TU DIARIO EN ESPAÑOLEl Corte Inglés abre en Valencia su segundo refugio de datos con el foco en la IA
- El ConfidencialEl Corte Inglés (Kumo) esquiva el pulso normativo y pone en marcha en Valencia su segundo centro de datos 'boutique'
- La RazónKumo inaugura en Valencia su segundo centro de datos de máxima seguridad
- europa pressKumo (El Corte Inglés) inaugura en Valencia su nuevo centro de datos...
- Juan Antonio Sagredo
- Mayor of Paterna, who attended the inauguration
- Manuel Moreno
- Operations director of Kumo Networks, who attended the inauguration
Pollar is free and carries no ads in the text. Its members keep it going.
Support Pollar