Transport · Warsaw
PKP Intercity plans satellite internet pilot on Pendolino trains after trials beat GSM speeds
PKP Intercity will launch a five-month satellite internet trial on a passenger-carrying Pendolino train between late October and early November 2026. The move follows tests where satellite links delivered high quality across 55% of travel time versus 18% on GSM networks.
AI text based on reports by wnp.pl, wiadomosci.radiozet.pl, rmf24.pl and other publishers. Published . How it is made
For membersThe first 30 seconds for everyone. Synthetic voice (AI).
In brief
PKP Intercity will run a five-month satellite internet trial on a passenger-carrying Pendolino train starting between late October and early November 2026.
Technical tests showed satellite links maintained very good internet quality across 55% of travel time, compared to 18% achieved by GSM operators.
The carrier began testing Starlink on ED160 Stadler Flirt trains in February 2025 before evaluating Eutelsat OneWeb satellites in August 2026.
Board member Joanna Siecińska stated that successful tests will lead to permanent satellite receiver installations during general overhauls in 2028–2029.
- August 2026Testing conducted using Eutelsat OneWeb low Earth orbit satellites
- October–November 2026Five-month passenger pilot launches aboard an active Pendolino train
- 2028–2029Planned receiver installation during general overhauls if trials succeed
Pilot launch on passenger routes
Polish national rail operator PKP Intercity plans to launch a five-month satellite internet pilot on an active Pendolino route between late October and early November 2026. The trial represents the carrier's first test of satellite connectivity on a service carrying paying passengers, who will receive post-trip surveys to evaluate connection stability. Previous technical testing across the network took place strictly on empty trainsets without passengers.
Joanna Siecińska, PKP Intercity board member for finance and business development, detailed the shift to real-world passenger testing.
“Until now, we have tested satellite internet on trains without passengers. Now we want to learn our passengers' opinions, which is why a survey will be conducted after the journey. We assume that the pilot will last five months.”
Connectivity tests in network dead zones
The carrier initiated technical evaluations to resolve connectivity dropouts in rural and non-urban areas, commonly designated as white spots on route maps. Cellular signals from partner GSM operators frequently deteriorate or fail in sparsely populated regions because of inadequate base station infrastructure along track corridors. PKP Intercity intends to use low Earth orbit (LEO) satellite constellations to fill these geographical gaps rather than replacing mobile network infrastructure entirely.
“This concerns zones far from urbanized areas where the connection disappears due to insufficient infrastructure of cooperating GSM operators. We want to develop these areas and use satellite internet in these specific points on the map. It will not replace the services of GSM operators, but will constitute a complementary service.”
Recent evaluations demonstrated that satellite connectivity maintained very good internet quality across 55% of total travel time. By contrast, traditional terrestrial GSM networks delivered comparable quality during 18% of travel time on the same routes.
- Satellite connection
- 55 %
- GSM operators
- 18 %
Data from the article text
Testing history and rollout schedule
The evaluation process began in February 2025, when PKP Intercity deployed Starlink hardware aboard ED160 Stadler Flirt trainsets. In August 2025, technicians conducted secondary trials aboard Pendolino units. Testing expanded further in August 2026 to assess European low Earth orbit infrastructure, specifically the OneWeb network operated by satellite communications firm Eutelsat.
If the upcoming five-month passenger trial yields positive results, PKP Intercity plans to install permanent satellite internet receivers on Pendolino trainsets during scheduled general overhauls between 2028 and 2029. Fleet installations of satellite receivers will remain restricted to Pendolino trains and planned future high-speed rolling stock.
Fleet Wi-Fi and digital platform changes
Alongside satellite trials, the operator reported that 100% of its electric multiple units and 70% of its passenger carriages currently provide onboard Wi-Fi. The company is pursuing several related digital initiatives scheduled for introduction before the end of 2026. These include a graphical seat selection interface for domestic journeys involving transfers, expanding a feature previously limited to direct services where connecting legs received automated seat assignments.
The carrier is also testing self check-in functionality on Pendolino trains, allowing passengers to validate tickets directly within the mobile application and removing the requirement for onboard conductor inspections. Development additionally continues on the carrier's new Central Sales System.
Ask about this text
Sources and context
- wnp.plPKP Intercity stawia na cyfryzację. Internetowa rewolucja w pociągach coraz bliżej
- wiadomosci.radiozet.plRewolucja na kolei. PKP zapowiada nowy pilotaż. "Wyraźnie poprawi jakość
- rmf24.plInternet, samodzielna odprawa i nie tylko. PKP szykuje rewolucję dla pasażerów
- www.money.plInternet z satelitów. PKP Intercity szykuje dużą zmianę
- Places
- Warsaw
Pollar is free and carries no ads in the text. Its members keep it going.
Support Pollar