Safety · Bidur and Kathmandu
Quick evacuation saves 900 pupils in Nepal minutes before flood destroys school
Headmaster Rajendra Dawadi evacuated Tribhuvan Trishuli Secondary School in Nuwakot district after phone calls warned of an oncoming glacial mudflow, safely moving students onto hillsides 13 minutes before water destroyed the campus.
AI text based on reports by G4Media.ro, Deutsche Welle, NOS and other publishers. Changed . How it is made
For membersThe first 30 seconds for everyone. Synthetic voice (AI).
In brief
At 09:10 on 26 August 2026, headmaster Rajendra Dawadi halted classes after telephone calls from Rasuwa warned of an oncoming flood.
All 900 pupils present out of 1,643 enrolled fled up hillside paths and onto redirected buses before the compound was destroyed at 09:23.
The concrete school facility in Bidur was submerged into the riverbed, leaving two staff members missing while the surviving group was rescued by helicopter two days later.
Triggered by an upstream glacier collapse on 26 August, the floods across central Nepal left 903 confirmed dead and 4,247 missing by 31 August.
- 26 AugSchool staff receive first telephone alerts of upstream flooding
- 26 AugFloodwaters destroy the school compound as the old bridge collapses
- Two days laterRescue helicopters evacuate stranded students and teachers from the hillside
Urgent warnings from upstream
Around 09:10 on Wednesday, 26 August 2026, phone alerts reached Tribhuvan Trishuli Secondary School in the town of Bidur, located in Nepal's Nuwakot district north of Kathmandu. A school accountant and staff members received frantic calls from relatives in Rasuwa and settlements situated eight kilometres upstream along the Trishuli River, reporting that a massive wave of mud and water was leveling entire villages. Almost simultaneously, an anxious parent rushed into the building to pull her daughter out of class. Although municipal authorities had issued no official flood alarm, 47-year-old headmaster Rajendra Dawadi stopped instruction immediately and initiated a full evacuation.
“I decided to delay no longer. Even if the flood did not happen, it was only one day of classes.”
Evacuation under time pressure
Roughly 900 of the 1,643 students enrolled at the secondary school were already in classrooms when the alarm sounded, primarily pupils aged 11 to 18. Younger cohorts had avoided the initial danger because their classes were scheduled to commence at 10:00. Dawadi ordered the school bell rung and sent staff to guide pupils up steep paths behind the school. When panicking children rushed toward the hillside, at least one student fainted and was carried up the slope on a teacher's motorcycle. Dawadi contacted school bus drivers by phone, instructing them to halt in safe zones. One arriving bus full of children was ordered to reverse over a newly constructed bridge, which cleared the crossing moments before an adjacent older bridge collapsed into the river.
“My friends and I survived by ten seconds.”
Destruction of the school campus
At approximately 09:23, roughly 13 minutes after the first phone call, the debris wave slammed into the Trishuli Bazaar area. The three-storey concrete school building, situated on a peninsula between the Trishuli River and a hydroelectric canal, was swept into the riverbed within seconds. From high ground a few hundred metres up the mountain, students and staff watched the local market and school boarding facilities disappear under mud and water. While all 900 pupils and 16 faculty members on campus reached safety, at least two school workers, including the accountant's mother, remained missing. The surviving students and teachers remained isolated on the hillside for two days due to obliterated roads until rescue helicopters airlifted them to safety.
Broader devastation across Himalayan valleys
The flood was triggered on 26 August by the collapse of a glacier upstream, sending flash floods through river valleys across central Nepal and into parts of Tibet. The disaster severed transportation corridors, wrecked bridges, destroyed residential quarters, and flooded hydroelectric tunnels where workers became trapped. In downstream locations such as Bharatpur, hundreds of recovered bodies exceeded local morgue capacities. By Monday, 31 August 2026, the nationwide casualty count reached 903 dead and 4,247 people missing. Dawadi, an English teacher and former student of the demolished school, called on national authorities to reconstruct the institution on safer ground.
- Confirmed dead
- 903 people
- Missing
- 4247 people
Data from the article text
Ask about this text
Sources and context
- G4Media.roDecizia de moment care a salvat din calea apelor 900 de elevi de la o școală din Nepal
- Deutsche WelleDocente salvó a 900 alumnos durante inundación en Nepal
- NOSSchooldirecteur redde in Nepal 1643 kinderen voordat overstroming school verwoestte
- Franceinfo"Mes amis et moi avons survécu à dix secondes près" : au Népal, un directeur de lycée permet à 1 643 élèves d'éviter la crue meurtrière
- Places
- Kathmandu
Pollar is free and carries no ads in the text. Its members keep it going.
Support Pollar