Safety · Lit-et-Mixe, Rouen, and Bilbao

Maltese cargo ship Miro G runs aground off Landes coast, 19 of 22 crew airlifted

The Maltese-flagged bulk carrier, not loaded at the time, ran aground near Lit-et-Mixe early on Friday, 20 November, after its two anchors failed to hold against gusts of up to 48 knots.

AI text based on reports by H Kαθημερινή, BFMTV, RTBF and other publishers. Published . How it is made

For membersThe first 30 seconds for everyone. Synthetic voice (AI).

In brief

Lit-et-Mixe, Rouen, Bilbao · France, Spain
How it came to this
  1. Late Thursday, 19 NovemberCaptain reports manoeuvring problems to the CROSS-A coastguard centre at Étel
  2. Thursday evening, 19 NovemberShip attempts emergency anchoring about 3 km off Lit-et-Mixe
  3. Early Friday, 20 NovemberMiro G runs aground off Lit-et-Mixe in gusts of up to 48 knots
  4. Friday morning, 20 NovemberHelicopter evacuation under way, with 19 of 22 crew lifted off

Drift toward the coast

The Miro G, a Maltese-flagged bulk carrier built in 2011, ran aground early on Friday, 20 November, off Lit-et-Mixe on the Landes coast of south-western France. The vessel was not loaded when it grounded, although LSEG data put it on course to take on 30,000 metric tonnes of wheat at Rouen for Libya. Its voyage to Rouen, where VesselFinder showed an expected arrival on 23 November, ran into trouble late on Thursday, 19 November. That evening the captain alerted the CROSS-A coastguard centre at Étel (Morbihan) to manoeuvring problems, and swell and crosswinds then pushed the ship toward shore. The Landes department was under an orange rain-and-flood alert that morning, with strong winds and heavy swell along the coast.

Emergency anchors and the grounding

Laurent Falhun, spokesman for the Atlantic maritime prefecture and a frigate captain, described the sequence to BFMTV on Friday morning. He said the alert reached him early on Thursday evening, and rescue services were activated while the ship kept drifting. The crew dropped two anchors in an emergency, but gusts of up to 48 knots, about 90 km/h, were too strong for the ship to hold its position.

“The ship's captain could no longer manoeuvre, or at least counter the swell and the crosswind pushing it toward the coast.”

Laurent Falhun

Falhun explained that grounding means the hull touches the seabed, which is different from capsizing, and that the ship now rests on sand. By Friday morning, 19 of the 22 crew members had been lifted off by helicopter.

Helicopter rescue and crew still aboard

The captain asked the CROSS-A coastguard centre at Étel for help evacuating his crew, and an Air Force Raffut SAR helicopter stationed at Cazaux in Gironde was sent to carry out the rescue. By Friday morning the operation was still running. Local authorities said three crew members had remained on the ship to help make it safe, and that towing was under consideration. The maritime prefecture set out its plan for the remaining crew in a communiqué.

“Part of the crew will remain on board to facilitate the next operations with the French authorities.”

Maritime Prefecture of the Atlantic
Miro G crew after the groundingcrew members
Evacuated by helicopter
19 crew members
Remained aboard
3 crew members

Data from the article text

Pollution checks and recovery

The prefect of the Landes, Gilles Clavreul, told BFMTV that his team was on its way and that no pollution had been detected for the time being. A helicopter carrying a specialist anti-pollution team and a representative of Abeilles International was heading to the ship to assess its hull and the risk of pollution. The ship is not a tanker, but it still carries fuel oil and lubricants for its propulsion. The Atlantic maritime prefect triggered level 3 of the ORSEC maritime plan, and the Franco-Spanish Biscaye plan was activated, sending a Spanish high-seas rescue tug from Bilbao toward the zone on Thursday evening. Authorities also served a formal notice on the shipowner, calling on it to remove any immediate or future danger and, in case of pollution, to limit the environmental impact.

What comes next

Authorities said the ship must be lightened before it can be refloated, and towing remains under consideration. A fuller update from the prefecture was expected in the afternoon of Friday, 20 November.

Ask about this text

Sources and context

Pollar is free and carries no ads in the text. Its members keep it going.

Support Pollar