Safety · Madrid
Crane collapse at Madrid construction site damages three buildings in Tetuán district, no injuries reported
A large construction crane toppled onto an in-progress building and two neighbouring residential blocks in the Tetuán district on Monday afternoon. Emergency services confirmed no one was hurt, but one family and the construction crew were evacuated.
AI text based on reports by eldiario.es, La Razón, LaVanguardia and other publishers. Published . How it is made
For membersThe first 30 seconds for everyone. Synthetic voice (AI).
In brief
Despite the scale of the collapse and damage to three buildings, emergency services confirmed there were no injuries.
The crane hit the in-construction site at Calle Francisco de Salas, plus residential blocks at Calle Castilla 19 and Calle Tenerife 60.
One family was asked to leave their home on Calle Tenerife, and workers were cleared from the building site.
Municipal Police used drones to inspect the damage and identify any additional hazards.
What happened
Just after 13:30 on Monday, a large iron crane collapsed inside a construction site at Calle Francisco de Salas 27-29 in Madrid's Tetuán district, near Bravo Murillo. The structure, which had been installed in an interior courtyard as part of a rehabilitation project begun last year, fell onto the building under construction and then struck two adjacent residential properties on Calle Castilla and Calle Tenerife.
“No injuries have been reported.”
Damage and evacuations
The impact caused a partial collapse of a dwelling on Calle Tenerife 60, leaving a large hole in its structure. On Calle Castilla 19, two terraces and the roof of a storage-unit area were damaged. As a precaution, the family living at the Tenerife address was evacuated, along with all workers from the construction site. By 15:00, no other residents had been forced to leave, though inspections were ongoing.
Emergency response
At least six fire crews from the Madrid City Council, along with two command vehicles, were deployed to secure the area and begin clearing debris. Samur-Protección Civil ambulances remained on standby throughout the intervention, although no medical attention was required. Municipal Police officers, supported by a drone unit, surveyed the scene to gauge the full extent of structural damage and to rule out further risks. National Police also attended.
Next steps
Firefighters continue to stabilise the affected sections. In coordination with the construction company, they plan to dismantle the collapsed crane. Technical inspections are under way to determine whether the neighbouring buildings remain structurally sound, and the immediate area stays cordoned off while the work proceeds.
Ask about this text
Sources and context
- eldiario.esLa caída de una grúa en una obra de Tetuán provoca el derrumbe parcial de un edificio
- La RazónCae una grúa de obra en Tetuán dañando tres inmuebles y obligando a desalojar una familia
- LaVanguardiaLa caída de una grúa en Madrid causa daños en tres edificios, sin heridos
- europa pressLa caída de una grúa de obra en Tetuán daña tres inmuebles y obliga...
- Places
- Madrid
Pollar is free and carries no ads in the text. Its members keep it going.
Support Pollar