Transport · Lisbon, Alverca do Ribatejo, and Póvoa de Santa Iria

NAV Portugal shortens northbound departure track at Lisbon airport to cut noise from 26 November

From 26 November, northbound departures from Lisbon's Humberto Delgado airport will share a track about 5.2 km shorter before splitting to destination routes, easing noise over parts of Alverca and Póvoa de Santa Iria.

AI text based on reports by Correio da Manha, Observador, SAPO and other publishers. Published . How it is made

For membersThe first 30 seconds for everyone. Synthetic voice (AI).

In brief

Lisbon, Alverca do Ribatejo, Póvoa de Santa Iria · Portugal
How it came to this
  1. 18 MarCouncil of Ministers resolution 58/2025 requires NAV Portugal to study alternative departure routes
  2. 2025Airspace organisation defined to increase airside capacity at Humberto Delgado Airport
  3. 18 NovNAV Portugal announces the new northbound departure routes
  4. 26 NovNew northbound departure routes take effect

What changes

NAV Portugal, the national air traffic manager, announced on Wednesday, 18 November that it will introduce new northbound departure routes at Humberto Delgado Airport in Lisbon from 26 November. The aim is to reduce noise over several areas north of the airport. Under the existing routes, northbound departures follow a shared track until a point about 6.8 nautical miles (NM) from the runway end, after which each aircraft joins the route for its destination. Under the new arrangement, that shared track ends at 4 NM, which cuts it by 2.8 NM, or about 5.2 kilometres.

Length of shared northbound departure trackNM
Existing routes, shared track end
6.8 NM
New routes, shared track end
4 NM

Data from the article text

Noise and affected areas

Because aircraft move onto destination routes earlier, NAV says Alverca do Ribatejo, Forte da Casa and Póvoa de Santa Iria will still be overflown, but no longer by every departure, only by some flights depending on destination. The initial track also partly avoids the populated area of Santa Iria da Azóia. NAV estimates that the number of residents potentially exposed to noise levels of 55 dB Lden or higher falls by about 35,000 in the areas analysed.

“In practice, the change means that, after northbound departures from the AHD, aircraft begin to head onto different routes earlier, depending on destination.”

NAV Portugal

Background and approval

The change follows Council of Ministers resolution 58/2025 of 18 March 2025, which required NAV Portugal to study alternatives to the routes then in use. NAV carried out that study in coordination with the national civil aviation authority, ANAC. The airspace organisation defined in 2025 aimed to increase airside capacity at Humberto Delgado Airport, and NAV says the technical assessment found the new layout compatible with it.

Operational view

The option selected by the Government weighed the estimated noise reduction against its operational feasibility. NAV said the technical assessment concluded that the new layout fits the organisation of Lisbon's airspace and should not affect the airport's capacity. The changes are scheduled to take effect on 26 November, eight days after the announcement.

“The option selected by the Government took into account the estimated reduction in noise exposure and its operational feasibility.”

NAV Portugal

Ask about this text

Sources and context

Pollar is free and carries no ads in the text. Its members keep it going.

Support Pollar