Transport · Hamburg, Pinneberg, and Kiel
Deutsche Bahn schedules two closures of Hamburg's Altona rail link in 2027 and 2028
The Verbindungsbahn between Altona station and Hamburg Hauptbahnhof will be closed for about a month in autumn 2027 and again in early summer 2028. Trains from Schleswig-Holstein will end early in Pinneberg during the works.
AI text based on reports by DIE WELT, stern.de and Norddeutscher Rundfunk. Published . How it is made
For membersThe first 30 seconds for everyone. Synthetic voice (AI).
In brief
Deutsche Bahn plans to close the Verbindungsbahn from 24 September to 22 October 2027 and again from 26 May to 23 June 2028.
Trains from Schleswig-Holstein will end early in Pinneberg during the 2027 and 2028 works, and passengers will continue to Hamburg by S-Bahn.
Lines to Kiel, Flensburg and Westerland face one-month full closures, with the Hamburg-Lübeck corridor renovation starting directly afterwards for half a year in 2028.
- 26 MaySecond closure planned to begin
- 23 JunSecond closure planned to end, with a platform at the new Altona station planned to open
- December 2029New Altona station planned to open
Two closures on the Altona link
Deutsche Bahn plans to close the Verbindungsbahn between Altona station and Hamburg Hauptbahnhof for periods in 2027 and 2028. The company confirmed the plan on request, after NDR had first reported it. Regional trains, long-distance services and S-Bahn lines all use the route.
The first closure is planned from 24 September to 22 October 2027. During that window the DB will rebuild an overhead line installation and install new switches. A second closure is set for 26 May to 23 June 2028, when the company intends to open a platform at the new Altona station.
Diversions to Pinneberg
During the works, trains from Schleswig-Holstein will end early in Pinneberg. Passengers must then continue to Hamburg by S-Bahn. Similar restrictions already hit commuters and travellers this summer, in 2026. The full closures of the lines to Kiel, Flensburg and Westerland on Sylt are each planned to last one month, from late September to late October 2027 and from late May to late June 2028. Directly after the 2028 closure to Kiel, Flensburg and Westerland, the Hamburg-Lübeck corridor is to be renovated for half a year.
The new Altona station
Deutsche Bahn is moving the existing Altona station to Diebsteich, an area in the northwest of the Altona-Nord district. Official construction started in July 2021. The new regional and long-distance station is due to open in December 2029, and S-Bahn trains will stop there as well. Housing is planned on the site of the old station.
Ask about this text
Sources and context
- DIE WELTHamburg transport: Altona is moving - why rail passengers will temporarily end up in PinnebergHamburger Verkehr: Altona zieht um - warum Bahn-Fahrgäste zeitweise in Pinneberg landen · original in German
- stern.deDeutsche Bahn to close Hamburg rail line again in 2027 and 2028Bahn sperrt Hamburger Bahnstrecke 2027 und 2028 erneut · original in German
- Norddeutscher RundfunkFrom Hamburg to Kiel, Flensburg or Sylt: Rail passengers must prepare for closures from autumn 2027Von Hamburg nach Kiel, Flensburg oder Sylt: Bahnreisende müssen sich ab Herbst 2027 auf Sperrungen einstellen · original in German
Pollar is free and carries no ads in the text. Its members keep it going.
Support Pollar