We use analytics to improve Pollar and, with your consent, the Meta pixel to measure sign-ups and purchases that come from our ads. You can change this anytime in Settings. Privacy policy

Search⌘K
HomeFor YouLiveBriefAsk
MapMarketsThreadsSoundsFilms
DomesticGeopoliticsEconomySocietyScience & TechInfrastructureSportCultureLifestyle
Support PollarNotifications
PrivacyNewsroomContactPublisher and newsroom
HomeBriefLiveThreadsSearch
Listen to the article4 min, read by a synthetic voice

In brief

  • The H3 rocket lifted off from Tanegashima at 04:41 local time on 20 October, and JAXA confirmed the MMX probe's separation during a live broadcast.

  • The probe is to collect at least 10 grams of regolith from at least 2 cm deep during a planned three-hour operation, with the capsule due to land in Australia in 2031.

  • US Congress halted funding in January 2026 under US President Donald Trump, after costs for NASA's Mars sample return rose to US$11 billion.

Tanegashima
Tanegashima · Japan
How it came to this
  1. 20 OctH3 rocket lifts off from Tanegashima carrying the MMX probe
  2. August 2027Probe expected to reach the Mars system
  3. 2030Return module scheduled to leave Mars orbit
  4. 2031Sample capsule scheduled to land in Australia

Launch from Tanegashima

Japan's H3 rocket lifted off from the Tanegashima Space Center at 04:41 local time on Tuesday, 20 October, carrying the Martian Moons eXploration (MMX) probe. The Japan Aerospace Exploration Agency (JAXA) confirmed during a live broadcast that MMX had separated from the H3 and begun its journey toward the Martian system. Thousands of people in Japan followed the launch live despite the early hour and posted messages of encouragement online. JAXA leads the project, which brings together France's CNES, NASA, the European Space Agency and Germany's DLR. The probe is designed to become the first to collect samples from one of Mars' two moons.

Cruise, landing and sampling

The cruise to Mars takes less than a year, and the probe is due to reach the Mars system in August 2027. It will then spend about three years around Phobos, a potato-shaped moon that one account puts at about 22 kilometres across, while another gives its largest diameter as nearly 27 kilometres. Before the main probe touches down, the Idefix rover, a French-German design about the size of a microwave oven with four wheels, will survey the surface and help select a landing site. The main probe is set to land on four legs and use a robotic arm to collect at least 10 grams of regolith from at least 2 centimetres below the surface during an operation planned to take three hours. Because Phobos has very weak gravity, the rover is expected to bounce for several minutes before coming to rest after landing.

Return and scientific questions

The return module is scheduled to leave Mars orbit in 2030, and the sample capsule is due to land in Australia in 2031. Scientists want to learn whether Phobos and Deimos are captured asteroids or debris from a large impact on Mars. They also hope the samples will show how water and organic compounds reached rocky planets, and whether the dust holds traces of ancient life. The team expects individual grains to be studied one by one, even though the total amount is small, and the best outcome would include some Martian dust in the sample. Professor Sara Russell, the mission's deputy for sample analysis, described the project in these words:

“I think this is an incredibly ambitious and fun mission”

Sara Russell, deputy for sample analysis on the MMX mission

Russell also pointed to a technical challenge: the moon has little gravity of its own, but its proximity to Mars makes it harder to get a rover onto the surface.

Competing programmes

Japan enters the work with an advantage, having already brought back samples from two asteroids on earlier missions. NASA's Mars sample return effort, which depended on material collected by the Perseverance rover since autumn 2021, saw its costs rise to US$11 billion, and the expected arrival of samples on Earth slipped to 2040 at the earliest. The US Congress halted funding in January 2026 under US President Donald Trump, and the project has effectively been cancelled. Nicky Fox, associate administrator for NASA's Science Mission Directorate, said:

“The samples from MMX will bring forth paradigm-shifting science on the Mars system for generations to come, especially as NASA prepares to send the first humans to Mars”

Nicky Fox

China's Tianwen-3 mission is planned to launch in 2028 and bring back at least 500 grams of Mars surface material, with landing in 2031.

Minimum sample mass planned by missiong
MMX (Japan)10
Tianwen-3 (China)500
MMX (Japan)
10 g
Tianwen-3 (China)
500 g

Data from the article text

NASA astrophysicist Tom Statler, who is involved in the project, described a great deal of excitement around the mission. The MMX mission is listed at a cost of US$578 million.

Next in today’s edition

Story 5 of 8

Photo: Estonian Foreign Ministry, CC BY 4.0 (Wikimedia Commons, cropped)Pope Leo XIV recovers at Vatican, backs Oleshky aidPope Leo XIV is convalescing at the Vatican after surgery on his right lung and was discharged from Rome's Gemelli hospital on Saturday, 17 October.Health & Education · 2 h ago
Today’s Brief · 5 min to listenZelenskyy accuses Washington of holding back paid Patriot missilesLive · 3 storiesUS delays Patriot missiles for Ukraine

Sources and context

  • Le Monde.fr5 h agoJapan launches spacecraft on historic Mars moon mission
  • Correio da Manha5 h agoJapanese space agency announces that MMX probe is on its way to Mars moonAgência espacial japonesa anuncia que sonda MMX está a caminho da lua de Marte · original in Portuguese
  • LBC6 h agoJapan's Mars moon mission blasts off in space exploration first | LBC
  • rmf24.pl7 h agoWill samples from Mars moon reach Earth? Japanese mission has launchedPróbki z księżyca Marsa trafią na Ziemię? Ruszyła japońska misja · original in Polish
Sara Russell
Deputy for sample analysis on the MMX mission
Donald Trump
US president under whom Congress halted NASA's Mars sample return funding, according to the reporting

Pollar is free and carries no ads in the text. Its members keep it going.

Support Pollar

First version yesterday at 09:38, last change today at 01:34.

Report an error in the text

Text generated by AI from the reports of the publishers listed and checked automatically, with no human editor. How Pollar is made

In this text

  1. 1Launch from TanegashimaLaunch from Tanegashima
  2. 2Cruise, landing and samplingCruise, landing and sampling
  3. 3Return and scientific questionsReturn and scientific questions
  4. 4Competing programmesCompeting programmes

Based on reports by

Le Monde.fr, Correio da Manha, LBC, rmf24.pl, Deutsche Welle, Mediafax.ro, tagesschau.de, DIE WELT

List of sources

Discoveries · Tanegashima

Japan launches MMX probe to bring Phobos moon samples back to Earth in 2031

Japan's H3 rocket lifted the MMX spacecraft from Tanegashima early on 20 October, starting a mission to bring at least 10 grams of material from Phobos back to Earth. The return capsule is scheduled to land in Australia in 2031.

Tanegashima

Ask about this text

AI text based on reports by Le Monde.fr, Correio da Manha, LBC and other publishers. Changed today at 01:34.

Ask your own question
How much material is the MMX probe expected to collect from Phobos?
When did the US Congress halt funding for NASA's Mars sample return?
How it is made