PKP Intercity has announced a historic decision to deploy its Pendolino trainsets on an international route. Starting with the next timetable adjustment, Polish high-speed trains will connect Bohumín with Prague, marking the first-ever use of these units outside the country. Simultaneously, the carrier is introducing new discount systems, and infrastructure managers nationwide are preparing for spring road and track repairs.
Pendolino on the Route to Prague
Polish high-speed trainsets will, for the first time in history, operate a regular passenger service within the Czech Republic.
New PKP Intercity Discounts
The carrier is introducing discount systems aimed at lowering ticket prices for travelers on selected routes.
Spring Timetable Adjustment
A new railway timetable comes into effect from the upcoming Sunday, accounting for numerous infrastructure repairs.
Road Repairs in Wrocław
Month-long disruptions in Karłowice due to the modernization of Przybyszewskiego Street and changes to traffic organization.
Polish railways are entering a new operational era with PKP Intercity's announcement of foreign expansion plans for its most prestigious trainsets. For the first time in history, Polish Pendolino trains will operate a regular route beyond the borders of the Republic of Poland. The new connection will be established within the Czech Republic, serving the route between Bohumín and the country's capital, Prague. This decision results from the carrier's long-term strategy aimed at increasing rolling stock utilization efficiency and strengthening its position in the Central European market. Additionally, PKP Intercity has announced the implementation of new promotional mechanisms designed to make rail travel more affordable for a broad range of passengers. Parallel to the revolution in long-distance rolling stock, passengers across the country must prepare for the March timetable adjustment. These changes are closely linked to the intensification of modernization works carried out by PKP PLK. Significant disruptions are expected in the Podkarpacie region and in areas where key investments under the National Railway Programme are being implemented. The adjustment aims to optimize train traffic amidst numerous construction sites, which often involves departures being shifted by several minutes or the introduction of replacement bus services on selected sections. The purchase of 20 Pendolino trainsets in 2011 was the largest investment in the history of Polish railways, worth approximately €400 million, but for years their certification for international operation remained a technical and formal challenge.1. raz — for the first time in history, Polish Pendolino will serve a foreign routeInvestments are also affecting road infrastructure in major urban areas. In Wrocław, repairs on Przybyszewskiego Street in Karłowice begin on Saturday, lasting about a month and forcing drivers to use detours. Similar localized disruptions have been reported in Lublin, where technical works on Chodźki Street have temporarily relocated public transport stops. Local authorities emphasize that the spring weather window is crucial for the timely completion of surface repairs after the winter period, leading to a concentration of renovations in March and April.
Perspektywy mediów: Media highlight the prestigious dimension of the Pendolino expansion and the benefits of new discounts for passengers. Official statements focus on the logistical aspect of the timetable adjustment and the necessity of carrying out repair works.